English (United Kingdom)Serbian (Latin)

7
DISTRIBUTION CENTRE DELTA-TEMPO in Niksic, 5300m2, Montenegro.

Final HVAC design and nostrification and conformation of other design disciplines in accordance with local regulations to expedite Building permit. Engineering supervision and inspection on structural and civil works


Copyright 2011. Kopring PMC | Intechprojekt. Powered by ANTICFORMA